[1] Status of Batch Reports
Adding Library Jobs to V-1 for Scheduling
How to add saved library jobs to V-1, save them as a library and then schedule them to run.
Menu Path: Report menus and V-1.
JM
How to add saved library jobs to V-1, save them as a library and then schedule them to run.
Menu Path: Report menus and V-1.
JM
Social networks